Note :
Stamp duty, registration charges, legal documentation charges, GST charges, maintenance deposits and AEC (torrent power) charges, Narmada water charges, gas pipeline charges shall be borne by the member separately. | Any
Additional charges or duties levied by the Govt. / local authorities during or after the completion of the scheme will be borne by the member. | The project consultant / developer reserve all then rights to make changes to design or
specifications of the project. | This brochure is not to be treated as a part of legal documents. It is meant for easy display and general information. All Elements, Objects, Treatments, Materials, Equipments and color scheme, Shown
are artistbs impression actual may be different as per architectb s design. All dimension shown here are unfinished to unfinished wall and of the longest measure of the area.